Case reference FOI2026/01270

Received 6 October 2026

Published 17 November 2026

Request

I am writing to ask for information held about a development of high-rise residential buildings: - Tantallon House, 130 Elephant Road, SE17 1EX (also recorded under SE17 1EY and SE1 6TJ) - Raglan House, 120 Elephant Road, SE17 1FA (also recorded under SE17 1FB) - Mawes House, 5 Castle Square, SE17 1EQan Tantallon and Raglan share a structure, and the development has also been described in court papers as the North, South and West Towers, so please identify each building by its address in your response. Please provide the following. The items are in priority order; if the request would exceed the cost limit, please answer as many as possible from the top and tell me how to refine the rest.

1. For all three buildings: the information provided under regulation 5 of the Fire Safety (England) Regulations 2022 on the design and materials of the external walls, the level of risk identified and the mitigating steps taken, and the date it was received. If the document itself is withheld, please state the external wall materials recorded, the risk rating given and the date received.

2. For all three buildings: the evacuation strategy currently recorded for the building, each previous strategy recorded since 2022, and the date the Brigade was notified of each change.

3. For all three buildings: the interim measures notified to the Brigade, including any waking watch and any temporary or enhanced fire alarm system, with start and end dates.

4. A copy of the incident record for the fire on the 10th May 2024 at Mawes House, with any personal data redacted.

5. For Tantallon House: the responsible person recorded for the building at each date since 2022, and the date of each change.

6. For Tantallon House: whether a building emergency evacuation plan under the Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 has been received for the building and, if so, the date received.

7. For Tantallon House: the dates and outcomes of all fire safety audits or inspections of the building since 1 January 2022, and copies of any resulting deficiency letters, action plans, alterations notices or enforcement notices.

8. For Tantallon House: any correspondence since 1 January 2022 between the Brigade and the responsible person, Get Living, Savills, Capital Property & Construction Consultants Ltd or Elephant Central Management Ltd concerning external wall remediation, interim measures or the evacuation strategy for the building, and the timescales given to the Brigade for remediation.

9. For Tantallon House: the date the building was added to the Brigade's record of buildings with cladding issues, the source of the entry recording aluminium composite material, and the remediation status currently recorded.

Response

Please see the two PDF files in the 'Documents' section below:

  1. FOI2026_01270_Response.pdf

  2. FOI2026_01270_Disclosed Documents (redacted).pdf.